St.Petersburg Flood Prevention Facility Complex

Participant in construction, 1979-2011:

  • 1979-1989. Subcontractor. Installation of metal engineering structures. Assembly of three-bay industrial workshops on the basis of the Gorskaya and Kotlin facilities, concrete plants on the basis of the Bronka and Kotlin facilities, installation of gantry cranes from the general contractors construction bases. Installation of hydraulic/mechanical equipment including 64 radial gates, 128 hydraulic drives.
  • 2005-2009. Contract 4 "Lift Flat Gate Construction Including Survey, Design, Manufacturing, Installation and Start-up Work". Sub-contractor. Construction of lift flat gate 2, turnkey. Equipment delivery, installation, commissioning operations.
  • 2006-2011. Contract 3 "Completion of Construction of the Navigation Pass 1, Tunnel (Northern and Southern Docking Chambers)". Subcontractor. Delivery and installation of hydraulic/mechanical equipment.
  • 2007-2011. Contract 3b "Floating Gate in the Course of Construction of the Navigation Pass 1 and Engineering Equipment for Water Discharge Facilities 1-6". Contractor. Principal maker. Supply and installation of the C1 floating gate and upgrading of the culvert engineering equipment 1-6.
  • 2007-2011. Contract 5 "Delivery, Completion of the Building of Electric Power Supply, Control and Telecommunication Systems". Contractor, principal executing agency. Delivery and installation of electric power supply, control and communication systems.

Participant of the maintenance and engineering support of the Flood Prevention Facility Complex:

  • 2010. Government Contract SF-10-0017 "Maintenance and Engineering Support of the culverts 1-6 of the Navigation Pass 2 of the St. Petersburg Flood Prevention Facility Complex. Contractor".
  • 2011. Government Contract ESB-11-003 "Maintenance and Engineering Support of the culverts 1-6 of the Navigation Pass 2 of the St. Petersburg Flood Prevention Facility Complex". Contractor.
  • 2012. Government Contract ESB-11-047 governing support, maintenance and repair of installations, structures and systems of the St. Petersburg Flood Prevention Facility Complex including all major and auxiliary installations and equipment, engineering infrastructure, computer-aided systems for the process and infrastructure control. Subcontractor. Maintenance and Engineering Support of the culverts 1-6 of the Navigation Passes C1 and 2.
  • 2013-2014. Government Contract KSEB-13-009 dated 10.09.2013 "Execution of phase-I work ensuring reliability and safe operation of hydraulic facilities of the St. Petersburg Flood Prevention Facility Complex as prescribed by the Safety Declaration of the State Customs Service". Contractor. Repair of concrete surfaces of the spans of the culverts 2 including underwater concrete surfaces, variable level zones, surfaces of baffle and bearing beams, gate frames with installation of repairing floating gates.